The project to build four new bridges to reduce traffic has been completed by 75%
These bridges have a total length of up to 2,874 meters and are designed for 17,600 vehicles per hour.
According to the Roads and Transport Authority (RTA), a project in Dubai involving the construction of four new bridges to ensure smooth traffic flow is 75 percent complete.
Garn Al-Sabkha-Sheikh Mohammad Bin Zayed Intersection road improvement project includes the construction of four bridges that are 2,874 meters long and have a capacity of 17,600 vehicles per hour.
This project aims to upgrade Garan Al Sabkha Street, a vital project that connects Sheikh Zayed Road and Sheikh Mohammed Bin Zayed Road. This ensures traffic flow between Sheikh Zayed Road, Sheikh Mohammed Bin Zayed Road, Aul Al Khail Road, and Al Asail Street.
4 new bridges
This project oversees the completion of four new bridges, and at the same time, the surface intersections on the service road parallel to Sheikh Mohammed Bin Zayed Road, as well as street lighting, traffic signals, traffic systems, rainwater drainage systems, and irrigation networks will be strengthened. he does.
Bridge 1: The first bridge is 943 meters long and is located at the intersection of Garen Al Sabkha St. and Al Asayl St. The two-lane bridge in each direction has a capacity of 8,000 vehicles per hour in both directions and facilitates the flow of traffic between Sheikh Zayed Road and Sheikh Mohammed Bin Zayed Road.
Bridge 2: The second bridge is 601 meters long and consists of two lanes and serves the traffic that moves from East Garn Al Sabkha Street in the direction of Sheikh Mohammad Bin Zayed Road and North in the direction of Al Qusais and Deira. This bridge has a capacity of 3200 vehicles per hour.
Bridge 3: The third bridge is a 664-meter-long two-lane bridge that ensures smooth traffic flow by eliminating overlapping traffic from Sheikh Mohammed Bin Zayed Road to the north to Al Yalais Street in the direction of Jabal Ali Port. The bridge can accommodate approximately 3,200 vehicles per hour.
Bridge 4: The fourth bridge, which is 666 meters long and consists of two lanes, helps to ensure the smooth flow of traffic by eliminating traffic overlap from Sheikh Mohammed Bin Zayed Road to the service road leading to the entrances of Dubai Manufacturing City. This bridge has a capacity of 3200 vehicles per hour.
EGSH in Dubai simplifies UAE government services like visa renewals, trade licenses, and Ejari registration, all in one day and one location.
The Dubai Mall announced on Tuesday that it expects a record 105 million visitors in 2023, a jump of more than 19 percent from last year's 88 million
Reviews
Please submit your comment.
It will be displayed after the approval of admins.
To do this, please login first
No comment submitted yet